Installation and commissioning

نصب و راه اندازی

List of fixed equipment

Heat Exchangers

Reactors

Piping

Storage tanks

Faucets

Pressure Relieving Devices

Boiler (steam boilers)

Furnace and heater

Pipelines

Instrumentation

Cathodic protection equipment

 

Rotary equipment list

Turbines

Pump

Dynamic pumps

Positive displacement pump

Compressors

Types of industrial electric motors

Gasoline Engine

Diesel engine

Gearboxes

 

Method of checking and preparing equipment:

Review and formulation of contract strategies and tenders program

Market analysis and identification of suppliers

Evaluation of suppliers

Preparation and distribution of tender documents

Management and control of the proposal preparation and submission process

Management and control of bid opening, technical and commercial evaluation, negotiation and awarding of contract or purchase order

Monitoring and control during construction

Shipping and delivery to the site

Termination of the contract


Installation and commissioning Installation and commissioning List of fixed equipment Heat Exchangers Reactors Piping Storage tanks
4 امتیاز از 1 رای
Sadra Telsa
4 Rates from 1 votes